Jasper Street Dept, along with contractor, RejuvTec , will be applying a Reclamite
As part of the City of Jasper’s on-going infrastructure maintenance, the Jasper Street Dept, along with contractor, RejuvTec , will be applying a Reclamite preservation solution to the following streets, beginning Monday, September 9th. Beginning each day at approximately 7:30 a.m. thru approximately 5:00 p.m. each day. The possibility exists of extending into the following week, in the event of inclement weather conditions or other unforeseen events. Reclamite is an asphalt rejuvenating emulsion that restores the original binder back to a proper balance. All vehicles must be removed prior to 7:30 a.m. from streets being processed. Affected residents will be notified, via a door hanger, in advance of treatment on their street. Motorists will not be allowed on these streets prior to contractor removing the barricades. Once barricades have been removed, the surface will be very slick with sand & may result in solution adhering to vehicles, therefore, extreme caution is advised, should you travel these streets shortly after barricades are removed. Sand will be removed within 2 days.
Trash, Recycling & Yard waste collection will proceed as normal & MUST be out no later than 7:00 a.m. for pickup, as our heavy trucks will not be traveling on fresh application.
Affected streets are as follows: (may not be processed in this order)
Street Name |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|